Selected work, with the numbers that are public and the lessons that are mine. The anchor is a five-year, $100 million healthcare energy program; the rest is what it taught me and where I have applied it since.
Featured case study · 2022 – 2025 · ENFRA (formerly Bernhard)
Mercy’s Energy Stewardship Program
Program management as a transformational service: a $100 million capital investment to renew critical infrastructure, enhance sustainability, and reduce operating cost across a 14-million-square-foot healthcare portfolio of more than 40 hospitals.
$100M
Capital program across 14 million square feet
$9.4M
Identified annual savings
$109M
Projected 20-year net operating savings
119%
Of targeted savings achieved (119.37%)
11%
Internal rate of return on efficiency investment
70
Design-build projects since 2019
11M+
Square feet retro-commissioned, $2M+ annual utility savings
$37.4M
Five-year network initiative the program expanded into
My role
I joined the program in 2022 managing a portfolio of Building Automation System design-build projects, moved to Engineering Project Manager II with a remit of capital planning and operational strategy, and in October 2024 took over as Engineering Services Program Manager and the primary point of contact for Mercy. In that seat I coordinated engineering, mechanical, and sustainability divisions, led the ongoing services (monitoring-based commissioning, measurement and verification, commodity management), and owned the program management plan, governance cadence, and client reporting for a portfolio spanning St. Louis, Springfield, Fort Smith, Northwest Arkansas, Oklahoma City, and Mercy South.
The challenge
Mercy’s facilities carried extensive deferred energy and infrastructure needs: aging central plants, pneumatic controls, legacy automation systems, and no unified view of utility performance across the network. The pivotal challenge was prioritizing scope within the budget. That meant selecting measures that maximized energy savings while deliberately weighting the upgrade of Building Automation Systems, because BAS modernization is what makes every later measure measurable, maintainable, and defensible, and it is where long-term sustainability and cybersecurity posture actually live.
The approach
One program, eight offerings. Turn-key design-build (infrastructure upgrades and replacements; BAS and controls upgrades, with commissioning), retro-commissioning, integrated utility metering with daily scorecards, measurement and verification, monitoring-based commissioning, utility incentive applications and tracking, and owner-operator training. Every project drew on that menu, and the ongoing services are what kept the savings from decaying after construction.
Assess, then rank. Comprehensive energy asset surveys and data collection across 14 million square feet produced a site-by-site energy conservation measure matrix: chilled water, tower water, metering, operator training, BAS upgrade, retro-commissioning, automatic fault detection, heating water, steam, air handlers, lighting. Each measure carried a cost, a savings estimate, a simple payback, and a flag for whether it addressed critical equipment. Scope was switched on or off per site against the budget, and sequenced into a five-year execution plan.
Modernize the controls first. The BAS upgrade transitioned facilities from pneumatic controls to Direct Digital Controls, replaced legacy systems, and implemented improved graphics that streamlined operations and problem detection. Patient comfort, regulatory compliance, and long-term sustainability all ride on this layer.
Instrument everything. Centralized utility metering, automatic fault detection on the DDC systems, and a Monitoring-Based Commissioning program enabled real-time analysis, fault detection, and proactive issue resolution: the groundwork for a proactive rather than reactive infrastructure management strategy.
Fund it so it survives. Mercy built a robust financial pro forma for the capital investment and dedicated funds for facility infrastructure at the start of each fiscal quarter, separated from revenue-generating capital such as imaging replacements. That separation is what kept the program continuous. Utility incentive rebates and third-party funds were captured to reduce net cost.
Govern it like a program, not a pile of projects. The program management plan I authored in October 2024 set strategic objectives and alignment, a governance structure with cross-team collaboration and client engagement, phased planning (needs assessment, resource allocation, implementation and monitoring), a risk framework with mitigation plans, KPIs for sustainability, client satisfaction, delivery efficiency, and market impact, and a quarterly review and annual strategic assessment cadence.
Outcomes
- $9.4 million in identified annual savings and a projected $109 million in net operating savings over 20 years, at an 11% internal rate of return on energy efficiency investment.
- Since 2019, 70 design-build projects delivered through collaboration between engineering, mechanical, and sustainability divisions, focused on BAS upgrades, retro-commissioning, and MEP equipment replacement.
- Retro-commissioning implemented across roughly 11,032,061 square feet of Mercy campuses, producing $2,026,432 in annual utility savings and $1,993,483 in utility incentive rebates; ongoing M&V, MBCx, commodity management, and utility incentive services netted over $17 million in annual savings and avoided energy cost.
- BAS upgrades put an estimated 4,780,000 square feet onto new Direct Digital Controls, replacing legacy DDC and pneumatic systems; infrastructure projects replaced more than 30 critical pieces of equipment, including boilers, chillers, cooling towers, air handling units, and generators.
- As of the July 2024 status update: 70 capital projects (56 complete, 14 underway) at $37.4 million in contract value, 82% average completion, with metered sites running at 122% of their original utility savings target.
- BAS, boiler, chiller, and HVAC renewals completed or underway across sites including Oklahoma City, Springfield, St. Louis, Fort Smith, Northwest Arkansas, Washington, Jefferson, Joplin, Ada, Ardmore, Edmond, Bentonville, Bella Vista, Mercy South, and the Virtual Care Center.
- Program achieved 119.37% of targeted savings and expanded into a broader network initiative valued at roughly $37.4 million over five years (nearly $50 million including the Fort Smith Tower West project).
The program is written up publicly by ENFRA: Roadmap to Modernization: A Case Study of Mercy’s Energy Stewardship Program. I also authored a conference session abstract, Program Management in Action: Mercy’s Energy Stewardship Program as a Transformational Service Offering, for the Texas Association of Healthcare Facilities Management.
What it taught me
Capital discipline is a ranking problem with a measurement plan attached. If you cannot say how you will know a project worked before you fund it, you have not finished the proposal. And the measure that looks mediocre on simple payback is often the one that makes every other measure possible.
More work
Before and after the program
Energy savings performance contracting
Johnson Controls · 2018 – 2022
Over $6 million in energy efficiency and infrastructure modernization contracts for Oklahoma owners, structured as guaranteed-savings ESPCs that unlocked capital for immediate upgrades. Top sales performer in the state three consecutive years. Led the financial modeling that aligned facility investments with each system’s priorities.
Digital building solutions
Johnson Controls · 2025 –
Connected technologies, Metasys automation, HVAC optimization, and lifecycle service strategies for healthcare, commercial, and institutional owners, positioned as capital-planning decisions rather than technology purchases.
Strategic Foresight LLC
Advisory · 2024 –
Capital raising and allocation for management companies under shifting credit, inflation, and regulatory conditions; product strategy, regulation, and go-to-market for portfolio companies; bottom-up estimates of AI value creation and implementation strategy.
Economics of AI inference, in the classroom
University of Central Oklahoma · 2025 –
Course material on inference costs, compute capital expenditure, and hardware cost curves in the AI supercycle, used as live case studies in managerial economics; a journal-grade case study in preparation. Audited UCO’s first AI management course in Fall 2026 and delivered its week-seven lecture.